Search

Date
Filter by the proposal posted, decision posted, and update dates.

191 results

Displaying notice 181 - 191 of 191

TCP number
000-0045
Type notice
Policy
Notice stage
Decision
Decision posted
Proposal posted
Comment period
December 14, 2021 - January 14, 2022 (21 days) Closed
Last updated

The posting to seek public comments related to the 2+1 Pilot Project – Site Selection Criteria Report is now closed. 93 comments were received. As the result of some of the comments, the content of the Design Parameters Report will be updated.

TCP number
000-0049
Type notice
Standard
Notice stage
Decision
Decision posted
Proposal posted
Comment period
December 9, 2021 - January 6, 2022 (21 days) Closed
Last updated

The Steel Beam Guide Rail Specification SSP 721S09 will continue the Contract Preparation System (CPS) implementation process.
A comment was received for SSP 741S03 that will result in having to edit the Temporary Construction Barrier specification. Once edited, SSP 741S03 will continue the CPS implementation process.

TCP number
000-0051
Notice type
Standard
Notice stage
Exception
Exception posted
Last updated

Installation drawings and modification to Special Provision 741S03 to allow the use of restrained Type X and Type Z temporary concrete barriers on MTO contracts. 

TCP number
000-0050
Notice type
Standard
Notice stage
Exception
Exception posted
Last updated

Installation drawings and update to special provision 107S06 to allow the use of the Traffix Delta crash cushion as an option on MTO contracts.

TCP number
000-0044
Notice type
Standard
Notice stage
Exception
Exception posted
Last updated

EXCEPTION
This specification includes an amendment to OPSS 313, April 2021 when the tender item title includes “Warm Mix”. It also covers the requirements for the placement, compaction, and acceptance of warm mix asphalt (WMA), submissions, materials sampling, emissions measurements, temperature measurements, and documentation. 
 

TCP number
000-0037
Type notice
Standard
Notice stage
Review
Proposal posted
Comment period
September 7, 2021 - November 20, 2021 (60 days) Closed
Last updated

The Highway Design office is soliciting comments on the current MTO Highway Drainage Design Standards to be considered in an update to the document

TCP number
000-0041
Notice type
Standard
Notice stage
Exception
Exception posted
Last updated

The salt supplier industry has advocated for a revised material specification for sodium chloride consistent with specification requirements from other jurisdictions OPSS 2502.MUNI. MTO has conducted targeted advance consultation with salt suppliers, highway maintenance contractors, and Ontario Road Salt Management Advisory Committee. 

TCP number
000-0039
Type notice
Standard
Notice stage
Decision
Decision posted
Proposal posted
Comment period
September 13, 2021 - October 4, 2021 (21 days) Closed
Last updated

The posting to seek public comments related to the 2+1 Pilot Project – Site Selection Criteria Report is now closed. No comments were received during the review period. The report will be finalized as posted.

TCP number
000-0040
Type notice
Standard
Notice stage
Decision
Decision posted
Proposal posted
Comment period
September 17, 2021 - October 8, 2021 (21 days) Closed
Last updated

No comments were received. Guideline will be implemented as posted.

TCP number
000-0038
Type notice
Standard
Notice stage
Decision
Decision posted
Proposal posted
Comment period
September 7, 2021 - September 28, 2021 (21 days) Closed
Last updated

Three comments were received. All are relevant and appropriate and will have responses posted.
As a result of the comments, MTOD 912.261 will be corrected to fix a typo, and MTOD’s 912.263 and 912.264 will be updated to remove redundant information. The drawings will be finalized and published.