Search

Date
Filter by the proposal posted, decision posted, and update dates.

249 results

Displaying notice 1 - 20 of 249

TCP number
000-0306
Type notice
Standard
Notice stage
Proposal
Proposal posted
Comment period
June 26, 2026 - July 24, 2026 (28 days) Open
Last updated

This is is to introduce several new MASH-compliant roadside safety systems and updates existing Ontario Provincial Standard Drawings (OPSDs) through the introduction of new MTO Drawings (MTODs) to improve safety performance and ensure consistency with current MTO standards. • Introduction of two new Ram Shield Systems and two EZY GUARD SBGR systems. • Introduction of a MASH Steel Beam Guardrail Type M installed on base plated or embedded underground slab foundations. • Provision of additional MTO drawing (MTOD) to facilitate transitions from roadside concrete barriers to vertical concrete parapets. • Replacement of OPSD 984.101 with a MASH tested, post mounted delineator installation. • Introduction of a MASH TL 3 SMARTPOD crash cushion. • Replacement of OPSD 989.110 and OPSD 989.210 with MASH compliant SQR LOC steel square post systems. • Introduction of a MASH TL 2 pedestrian handrail support system.

TCP number
000-0305
Type notice
Standard
Notice stage
Proposal
Proposal posted
Comment period
June 26, 2026 - July 17, 2026 (21 days) Open
Last updated

This is an update to the MTO’s OSIM Field Inspection Guide (OFIG), following the related update of the Ontario Structure Inspection Manual, earlier this year.

TCP number
000-0303
Type notice
Standard
Notice stage
Proposal
Proposal posted
Comment period
June 19, 2026 - July 17, 2026 (28 days) Open
Last updated

A new guideline has been drafted to improve the scoping of geophysical investigations for foundation-related applications concerning MTO assets. Selected challenges often addressed through the application of geophysics are presented alongside the corresponding typical investigation solutions.

TCP number
000-0296
Type notice
Standard
Notice stage
Decision
Decision posted
Proposal posted
Comment period
April 8, 2026 - May 6, 2026 (28 days) Closed
Last updated

The Ontario Structure Inspection Manual 2026 update will move to final publication.

TCP number
000-0302
Notice type
Policy
Notice stage
Exception
Exception posted
Last updated

This policy provides guidance for selection of difference between design and posted speed (Factor of Safety) on freeways.

TCP number
000-0301
Type notice
Standard
Notice stage
Review
Proposal posted
Comment period
May 29, 2026 - June 19, 2026 (21 days) Closed
Last updated

OPSS.PROV 127 Schedule of Rental Rates for Construction Equipment is being shared for consultation prior to the annual publishing of the Schedule.

TCP number
000-0300
Type notice
Standard
Notice stage
Review
Proposal posted
Comment period
May 20, 2026 - June 17, 2026 (28 days) Closed
Last updated

NSSP BITU0027 and NSSP BITU0028 are replaced with SSP 111S15 and SSP 103S58, respectively, for the acceptance of Recovered Asphalt Cement (RAC) on MTO contracts. The contents of the specifications are kept similar as per NSSP BITU0027 and NSSP BITU0028 with changes for Recovered Asphalt Cement acceptance requirements as per Table 1 in SSP 111S15 (Files with tracked changes are attached).

TCP number
000-0214
Type notice
Policy
Notice stage
Decision
Decision posted
Proposal posted
Comment period
July 15, 2024 - August 5, 2024 (21 days) Closed
Last updated

The policy memo of Use of Premium Reinforcement in Bridges will be published on MTO’s Technical Publication website.

TCP number
000-0171
Type notice
Standard
Notice stage
Decision
Decision posted
Proposal posted
Comment period
August 18, 2023 - October 2, 2023 (45 days) Closed
Last updated

Following industry consultations, the draft MTO’s Prestressed Concrete Girder Guidelines and associated. Structural Standard Drawings will be published on the MTO’s Technical Publication website and implemented in CPS.

TCP number
000-0202
Type notice
Standard
Notice stage
Decision
Decision posted
Proposal posted
Comment period
April 16, 2024 - May 7, 2024 (21 days) Closed
Last updated

No comments were received from the TCP posting.

TCP number
000-0166
Type notice
Standard
Notice stage
Decision
Decision posted
Proposal posted
Comment period
June 23, 2023 - July 14, 2023 (21 days) Closed
Last updated

The comments received from industry partners were very helpful and allowed MTO to refine and clarify the direction given in OPSS 710. Examples include minimum application temperatures, air compressor requirement, relative humidity requirement, glass bead rate for durables, recessing equipment and allowing grinding on final course HMA for durables removal.

TCP number
000-0184
Type notice
Standard
Notice stage
Decision
Decision posted
Proposal posted
Comment period
November 2, 2023 - December 17, 2023 (45 days) Closed
Last updated

The Structural Manual has been updated with a few changes to incorporate comments received through the consultation process. The final version of the document will be posted on MTO’s technical Publication website.

TCP number
000-0186
Type notice
Standard
Notice stage
Review
Proposal posted
Comment period
December 15, 2023 - January 19, 2024 (35 days) Closed
Last updated

Drainage Section is submitting OPSS.PROV 410 for external stakeholders’ consultation prior to publishing the updated version of the specification.

TCP number
000-0183
Type notice
Policy
Notice stage
Decision
Decision posted
Proposal posted
Comment period
October 19, 2023 - November 9, 2023 (21 days) Closed
Last updated

The updated Qualification Procedures for Contractors will be published on the MTO’s Technical Publications website in the fall of 2023.

TCP number
000-0180
Type notice
Standard
Notice stage
Decision
Decision posted
Proposal posted
Comment period
October 19, 2023 - November 16, 2023 (28 days) Closed
Last updated

No TCP comments received.

TCP number
000-0177
Type notice
Standard
Notice stage
Decision
Decision posted
Proposal posted
Comment period
October 6, 2023 - October 27, 2023 (21 days) Closed
Last updated

The decision has been made to approve the specifications and proceed with implementation.