February 16, 2023 - March 9, 2023 (21 days) Closed
Last updated
This is one of the seven (7) newly proposed trenchless technology provincial specifications based on the existing Non-Standard Special Provisions (NSSPs) that had been used on MTO contracts.
February 16, 2023 - March 9, 2023 (21 days) Closed
Last updated
This is one of the seven (7) newly proposed trenchless technology provincial specifications based on the existing Non-Standard Special Provisions (NSSPs) that had been used on MTO contracts.
February 16, 2023 - March 9, 2023 (21 days) Closed
Last updated
This is one of the seven (7) newly proposed trenchless technology provincial specifications based on the existing Non-Standard Special Provisions (NSSPs) that had been used on MTO contracts.
February 16, 2023 - March 9, 2023 (21 days) Closed
Last updated
This is one of the seven (7) newly proposed trenchless technology provincial specifications based on the existing Non-Standard Special Provisions (NSSPs) that had been used on MTO contracts.
February 16, 2023 - March 9, 2023 (21 days) Closed
Last updated
This is one of the seven (7) newly proposed trenchless technology provincial specifications based on the existing Non-Standard Special Provisions (NSSPs) that had been used on MTO contracts.
February 16, 2023 - March 9, 2023 (21 days) Closed
Last updated
This is one of the seven (7) newly proposed trenchless technology provincial specifications based on the existing Non-Standard Special Provisions (NSSPs) that had been used on MTO contracts
December 22, 2022 - February 5, 2023 (45 days) Closed
Last updated
Guide for the preparation of hydrotechnical reportsthat are to be submitted to MTO. The guide is an update to the 2009 MTO Guide for Preparing Hydrology Reports for Water Crossings
November 28, 2022 - December 19, 2022 (21 days) Closed
Last updated
The MTO is planning to implement the ‘Streamlined Engineering Appraisal’ system in early 2023. The attached appraisal system (Excel form) has been developed for use on Preliminary and Detailed Design Engineering Assignments. The objective of the ‘Streamlined Engineering Appraisal’ process is to reduce administrative burden and assist the ministry with ensuring higher rates of appraisal completion.
October 21, 2022 - November 11, 2022 (21 days) Closed
Last updated
2 comments were received. In response, the draft SSP110S17 has been edited to provide clarification to address comments. SSP110S17 will be finalized and published.