Decision summary
Prior to TCP posting this standard has been discussed with ORBA and comments received through Technical Consultation portal were also carefully reviewed and evaluated. The drawing has been updated to incorporate a comment from ORBA and considered ready for publishing.
Decision details
The Standard drawing SS107-9 shows minimum bracing requirements to support NU Girders during construction. Prior to posting on MTO’s Technical Consultation portal, updates to the drawing were made after consultation with ORBA during past two years. MTO has carefully reviewed have evaluated the comments received through TCP and have considered to fine tune the Standard drawing.
Effects of consultation
As a result of consultation, the drawing has been updated to show location of intermediate bracing from the CL of bearings at 5m distance measured parallel to girder line for bridges with skew 20 degrees or less.
Upon industry’s request regarding installation of intermediate bracing; Construction Note 3 on the drawing has been modified.
Supporting materials
Connect with us
Original proposal
Proposal details
This drawing shows minimum bracing requirements to support NU Girders during installation.
MTO has incorporated ORBA’s comments to maintain Girder stability for safe installation of NU girders.
Supporting materials
Comment
Commenting is now closed.
This consultation was open from August 5, 2022
to September 4, 2022
Comments received
Through the portal
4