If the Ministry is looking to alienate more readymix suppliers, I believe the penalties embedded within the SP will do just that.
We already have difficulty finding a readymix supplier willing to take on the risk and the onerous administrative needs that the MTO demands.
Read more
Changes to the referee testing for RCP results will likely result in more rejections due to the shortened time frame and the larger difference from acceptance result.
Read more
For clause 1350.04.02.01.04, point c:
This requirement is redundant with the documentation required to be listed on the CASL. These materials already would have demonstrated compliance with the requirements of OPSS 1002.
Read more
I represent a concrete producer in the Ontario construction industry and would like to raise the following points of consideration with the Ministry related to the proposed changes highlighted in the draft Special Provision No. DBSP1350:
Read more
I represent a concrete producer in the Ontario construction industry and would like to raise the following points of consideration with the Ministry related to the proposed changes highlighted in the draft Special Provision No. DBSP1350:
Read more
Since this standard has now deleted the definition of “High Strength Concrete”, does the definition included in CSA A23.1/.2 – 2024 now apply as per below?
1350.05.04.01 – General The requirements outlined in this section regarding GWP reduction and environmental reporting raise several concerns for the ready-mixed concrete industry, as summarized below:
Ground granulated blast furnace slag or fly ash or a combination of the two materials and shall be restricted to the following proportions by mass of the total cementing material: a) Slag up to 25%.
Clause 1350.07.04.02 Discharge Time
When concrete or OGDL is transported by means of non-agitating equipment, discharge shall be completed within 30 minutes after introduction of the mixing water to the cement and aggregates.
Read more
Sorry for the delay, I hope my comments are considered.
We have been working for MTO projects for many years, and we usually encounter additional challenges in MTO projects for the following reasons (some of them have been discussed already and there are plans address them)
Read more
Consulter les commentaires qu'a reçus cet avis par l'entremise du registre. Vous pouvez soit tous les télécharger, soit utiliser la fonction de recherche et de tri ci-dessous.
Certains commentaires ne seront pas affichés en ligne. Apprenez-en davantage sur l'état du commentaire et sur nos politiques relatives aux commentaires et à la protection de la vie privée.
Télécharger les commentaires
If the Ministry is looking…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
539
Commenting on behalf of
Comment status
Related actions
Changes to the referee…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
540
Commenting on behalf of
Comment status
Related actions
For clause 1350.04.02.01.04,…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
541
Commenting on behalf of
Comment status
Related actions
1350.04.01.01.01 General…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
542
Commenting on behalf of
Comment status
Related actions
I represent a concrete…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
543
Commenting on behalf of
Comment status
Related actions
I represent a concrete…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
544
Commenting on behalf of
Comment status
Related actions
1350.03 – DefinitionsSince…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
545
Commenting on behalf of
Comment status
1350.03 – Definitions
Since this standard has now deleted the definition of “High Strength Concrete”, does the definition included in CSA A23.1/.2 – 2024 now apply as per below?
Read moreRelated actions
1350.04.01.01.01 – General…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
546
Commenting on behalf of
Comment status
1350.04.01.01.01 – General
Read moreRelated actions
1350.05.04.01 – GeneralThe…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
547
Commenting on behalf of
Comment status
1350.05.04.01 – General
Read moreThe requirements outlined in this section regarding GWP reduction and environmental reporting raise several concerns for the ready-mixed concrete industry, as summarized below:
Related actions
Ground granulated blast…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
548
Commenting on behalf of
Comment status
Ground granulated blast furnace slag or fly ash or a combination of the two materials and shall be restricted to the following proportions by mass of the total cementing material:
Read morea) Slag up to 25%.
Related actions
1350.05.04.02 – Plastic…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
549
Commenting on behalf of
Comment status
1350.05.04.02 – Plastic Concrete Requirements
Read moreRelated actions
1350.06.02 – Delivery…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
550
Commenting on behalf of
Comment status
1350.06.02 – Delivery Equipment
Read moreThe prohibition on the use of mobile mixers raises the following concerns:
Related actions
1350.07.04.02 – Discharge…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
551
Commenting on behalf of
Comment status
1350.07.04.02 – Discharge Time
Read moreThe specified discharge time limits raise the following concerns:
Related actions
Clause 1350.07.04.02…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
552
Commenting on behalf of
Comment status
Related actions
1350.08.01.01 GeneralNo…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
553
Commenting on behalf of
Comment status
1350.08.01.01 General
Read moreRelated actions
1350.05.04.02 Plastic…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
554
Commenting on behalf of
Comment status
1350.05.04.02 Plastic Concrete Requirements
Read moreRelated actions
Table 5DBPenalty for 28-Day…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
555
Commenting on behalf of
Comment status
Table 5DB
Read morePenalty for 28-Day Compressive Strength
Related actions
Table 6 DBPenalty for Air…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
556
Commenting on behalf of
Comment status
Table 6 DB
Read morePenalty for Air Void System Parameters of Hardened Concrete for Concrete Other Than Silica Fume Overlays and HPC
Related actions
Table 7 DB, Table 8DB and…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
557
Commenting on behalf of
Comment status
Table 7 DB, Table 8DB and Table 9 DB
Read moreRelated actions
Sorry for the delay, I hope…
Comment on
NSP DB 1350 – Spécifications des matériaux pour le béton – Matériaux et production
Comment ID
558
Commenting on behalf of
Comment status
Related actions