Comments

View the comments this notice received through the registry. You can either download them all or search and sort below.

Some comments will not be posted online. Learn more about the comment status and our comment and privacy policies.

Download comments

Search comments

Comment ID

378

Commenting on behalf of

Individual

Comment status

Comment approved More about comment statuses

Under 3.3 Hollow and Solid Precast Slabs

The 1220 mm wide hollow slab typically contained three circular voids. However, they are not recommended for several reasons.

maybe use included in the standard OPSD? that will be more specific.

Read more

Comment ID

380

Commenting on behalf of

Individual

Comment status

Comment approved More about comment statuses
I reviewed proposed prestressed concrete girder guidelines and drawings, the guidelines are concise and perfect, and covered all girder design issues, which is easy for design engineer to follow, and also the standard drawing are so much in details. Read more

Comment ID

381

Commenting on behalf of

Ontario Road Builders' Association (ORBA)

Comment status

Comment approved More about comment statuses
Thank you for the opportunity to provide comments. Please see attached MTO standard drawings and Girder Guidelines marked-up with our member's comments. Note that we only commented on the NU2400 unit drawing as the comments are applicable to all the other NU girder sizes as well. Read more

Comment ID

387

Commenting on behalf of

Individual

Comment status

Comment approved More about comment statuses
NU girder depths documented in the guideline vary by different increments with a 300 mm difference between the 900 and 1200 girders and 400 mm difference between the 2000 and 2400 ones. Girder depths have been produced in the past that are different than the 7 sizes in the guidelines. Read more

Comment ID

388

Commenting on behalf of

Entuitive Bridge Group - Toronto, Ontario

Comment status

Comment approved More about comment statuses
Prestessed Box Girders: - On the standard grid arrangement on SS107-13, strands have been removed from the bottom corners of the cross-section and placed at the top of the cross-section, why have these been omitted from the corners? Read more