Prestressed Concrete Girders and Prestressed Concrete Girders Guidelines

TCP number
000-0171
Notice type
Standard
Applies to
Structural Standard Drawing
No. specification
SS 107-25, SS 107-26, SS107-13, SS107-14, SS107-15, SS107-16
Posted by
Structures Office
Notice stage
Decision
Decision posted
Comment period
August 18, 2023 - October 2, 2023 (45 days) Closed
Last updated

This consultation was open from:
August 18, 2023
to October 2, 2023

Decision summary

Following industry consultations, the draft MTO’s Prestressed Concrete Girder Guidelines and associated. Structural Standard Drawings will be published on the MTO’s Technical Publication website and implemented in CPS.

Decision details

The Guidelines document and the associated standard drawings will be finalized for publication on the MTO’s Technical Publication site and for implementation in CPS.

Comments received

Effects of consultation

The feedback received through the TCP consultation has enabled MTO to enhance the clarity of the guidelines. Additionally, some drawing notes and details will be refined for the final publication

Connect with us

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

TCP number
000-0171
Type notice
Standard
Posted by
Structures Office
Proposal posted

Comment period

August 18, 2023 - October 2, 2023 (45 days)

Proposal details

MTO Prestressed Concrete Girder Design Guidelines are created as supplementary information to Design requirements of CHBDC, MTO Structural Manual and Exceptions to CHBDC contained in MTO’s Structural Manual- Division and other related documents. The guidelines are meant to encourage consistency in selection and design of precast concrete girders, improve their constructability and quality.

Existing Prestressed Concrete Box & NU Girders drawings have been updated to incorporate some industry’s feedback and field practices. The drawing details for Box Girders B700, B800 & B900 have been compiled on SS107-13 while SS107-11& SS017-12 are being archived. B1000 is shown on SS107-14 & SS107-15 provides details applicable to all sizes of the Box girders. The NU Girder details are contained in SS107-16 to SS107-24. Two new drawings SS107-25 and SS107-26 are being introduced to present Prestressed Concrete Solid Slab design details.

Comment

Commenting is now closed.

This consultation was open from August 18, 2023
to October 2, 2023

Connect with us