Commentaires

Consulter les commentaires qu'a reçus cet avis par l'entremise du registre. Vous pouvez soit tous les télécharger, soit utiliser la fonction de recherche et de tri ci-dessous.

Certains commentaires ne seront pas affichés en ligne. Apprenez-en davantage sur l'état du commentaire et sur nos politiques relatives aux commentaires et à la protection de la vie privée.

Télécharger les commentaires

Search comments

Comment ID

539

Commenting on behalf of

Individual

Comment status

Comment approved More about comment statuses
If the Ministry is looking to alienate more readymix suppliers, I believe the penalties embedded within the SP will do just that. We already have difficulty finding a readymix supplier willing to take on the risk and the onerous administrative needs that the MTO demands. Read more

Comment ID

541

Commenting on behalf of

Individual

Comment status

Comment approved More about comment statuses
For clause 1350.04.02.01.04, point c: This requirement is redundant with the documentation required to be listed on the CASL. These materials already would have demonstrated compliance with the requirements of OPSS 1002. Read more

Comment ID

543

Commenting on behalf of

Individual

Comment status

Comment approved More about comment statuses
I represent a concrete producer in the Ontario construction industry and would like to raise the following points of consideration with the Ministry related to the proposed changes highlighted in the draft Special Provision No. DBSP1350: Read more

Comment ID

544

Commenting on behalf of

Individual

Comment status

Comment approved More about comment statuses
I represent a concrete producer in the Ontario construction industry and would like to raise the following points of consideration with the Ministry related to the proposed changes highlighted in the draft Special Provision No. DBSP1350: Read more

Comment ID

547

Commenting on behalf of

Comment status

Comment approved More about comment statuses

1350.05.04.01 – General
The requirements outlined in this section regarding GWP reduction and environmental reporting raise several concerns for the ready-mixed concrete industry, as summarized below:

Read more

Comment ID

552

Commenting on behalf of

Individual

Comment status

Comment approved More about comment statuses
Clause 1350.07.04.02 Discharge Time When concrete or OGDL is transported by means of non-agitating equipment, discharge shall be completed within 30 minutes after introduction of the mixing water to the cement and aggregates. Read more

Comment ID

558

Commenting on behalf of

Individual

Comment status

Comment approved More about comment statuses
Sorry for the delay, I hope my comments are considered. We have been working for MTO projects for many years, and we usually encounter additional challenges in MTO projects for the following reasons (some of them have been discussed already and there are plans address them) Read more