This consultation was open from:
October 14, 2025
to November 4, 2025
Proposal summary
Schematic wiring diagrams for Type 1, 2, 3 supply cabinets are updated to reflect changes made to the Ontario Electrical Safety Code. Updates to the Ontario Electrical Safety Code states that a bonding conductor shall be installed from Panel to Meterbase casing. For further details, refer to Electrical Safety Authority (ESA) Bulletin 10-15-9 Diagram B1(a) (note: this bulletin is provided for reference only and not for consultation).
Proposal details
Supply cabinet details are updated to include bonding conductor shown from incoming supply to neutral bus for metered services.
Comment
Commenting is now closed.
The comment period was from October 14, 2025
to November 4, 2025