Dimension tolerances have been added to the new version. Has MTO considered adding location tolerances? CSA A23.1 Cl 6.4.6.1 gives dimensions tolerances from a reference grid system.
904.07.05.04 – “The concrete shall be placed in its final position and to its full depth in a continuous placing operation without interruption.” Tremie placements do not have a “
View the comments this notice received through the registry. You can either download them all or search and sort below.
Some comments will not be posted online. Learn more about the comment status and our comment and privacy policies.
Download comments
Dimension tolerances have…
Comment on
Construction Specification for Structures
Comment ID
430
Commenting on behalf of
Comment status
Related actions
A red dot was placed beside…
Comment on
Construction Specification for Structures
Comment ID
432
Commenting on behalf of
Comment status
Related actions
904.07.05.04 – “The concrete…
Comment on
Construction Specification for Structures
Comment ID
435
Commenting on behalf of
Comment status
904.07.05.04 – “The concrete shall be placed in its final position and to its full depth in a continuous placing operation without interruption.” Tremie placements do not have a “
Read moreRelated actions