Comments

View the comments this notice received through the registry. You can either download them all or search and sort below.

Some comments will not be posted online. Learn more about the comment status and our comment and privacy policies.

Download comments

Search comments

Comment ID

307

Commenting on behalf of

VSL

Comment status

Comment approved More about comment statuses
910.05.02.01 “The diameter of a duct, or an equivalent diameter of a non-circular duct, shall not exceed 40% of the least gross concrete section thickness at the location of the duct.” - This requirement is a structure design requirement, not a PT system requirement

Comment ID

309

Commenting on behalf of

VSL

Comment status

Comment approved More about comment statuses
910.05.03.01 “The pre-packaged dry grout mixtures shall be used within 6 months of packaging and shall be stored on site for a maximum of 1 month” - duration on site should be increased to 6 months, with proper storage conditions 910.06.02 Grouting equipment Read more