Comment

910.05.03.01
“The pre-packaged dry grout mixtures shall be used within 6 months of packaging and shall be stored on site for a maximum of 1 month”
- duration on site should be increased to 6 months, with proper storage conditions

910.06.02 Grouting equipment
“Calibrated within a 6 month period preceding the work. The device shall be accompanied by a certified calibration curve that bears the seal and signature of an Engineer”
- It is not understood what needs to be calibrated in a grouting pump. It should be removed