Penalty for Air Void System Parameters of Hardened Concrete for Concrete Other Than Silica Fume Overlays and HPC
- Increasing AVS penalties by factors ranging from 3.6 to 7.9 significantly elevates risk for both concrete producers and contractors.
- The magnitude of these penalties may exceed the value of the concrete supplied, creating disproportionate and difficult-to-manage risk exposure.
- Based on industry feedback, contractors may respond by qualifying bids or modifying practices to manage this risk, rather than focusing on in-place performance.
- There is a tendency to rely on concrete properties measured at the end of the chute instead of within the finished structure, which may not accurately reflect in-place conditions.
- Elevated penalties reinforce risk-avoidance behavior rather than encouraging proper placement, consolidation, and curing practices.
- This approach shifts responsibility toward the supplier for factors beyond their control, including placement and finishing operations.
- Overall, the significant increase in penalties amplifies project risk without clear evidence of improved durability or performance outcomes.
Submitted March 24, 2026 5:14 PM
Comment on
NSP DB 1350 – Material Specification for Concrete – Materials and Production
TCP number
000-0288
Comment ID
556
Commenting on behalf of
Comment status