This consultation was open from:
February 4, 2026
to February 25, 2026
Decision summary
References to RFC is updated to IR/CR under Contract Execution; Referenced to SP100F08 is replaced with SP199F01 in Traffic & Safety; Grout Strength, Normal Shotcrete, and Linear Shrinkage Testing have been removed; Track Coat under Asphalt Section has been added and refer to the updated specifications; Lift Thickness under Asphalt Paving has same scoring structure as Performance Graded Asphalt Cement; Updated the reference for the preventive measures- question 1 under Environmental Performance and Compliance of the Monthly Rating.
Decision details
Changes have been made as described in the attached document.
Effects of consultation
Clarifications made.
Supporting materials
Connect with us
Original proposal
Proposal details
The New CPR includes conversion from subjective to objective scoring, Form B’s have been eliminated and replaced with a simplified referencing system, simplified evaluation questions: Yes/No, check boxes, lists, deducting points rather than adding and all contracts will start with 100 points, and reduction in user error through automation of processes.
Supporting materials
Comment
Commenting is now closed.
This consultation was open from February 4, 2026
to February 25, 2026
Comments received
Through the portal
1