This consultation was open from:
May 22, 2025
to June 21, 2025
Decision summary
Following industry consultations, after minor corrections (if required ), the subject OPSS and related documents will be published on the MTO’s Technical Publication website and implemented in CPS.
Decision details
No comments were received from TCP consultation. The OPSS and associated documents will be finalized for publication on the MTO’s Technical Publication site and for implementation in CPS.
Effects of consultation
No comments were received from TCP consultation.
Supporting materials
Connect with us
Original proposal
Proposal details
The updates include following items:
-Incorporated SP 109S59.
-Updated references.
-Slight wording changes to match upcoming S6-25.
-Pre-installation verification and bolting procedure requirement with the erection submission
-Changes to submission requirements from 3 hard copies to electronic PDF format.
-Allow direct substitution of Grade A325, 7/8” bolts when Grade A325M, M22 bolts have been specified.
Included the requirement that bolt assemblies used with ACR exterior plate girders specified to receive a partial coating of the inside face shall be Type 3
-Included language to prohibit punched holes
- CAIS 906 updated to incorporate above items as required
Supporting materials
Comment
Commenting is now closed.
This consultation was open from May 22, 2025
to June 21, 2025
Comments received
Through the portal
0