Structural Manual v60

TCP number
000-0184
Notice type
Standard
Posted by
Structures Office
Notice stage
Decision
Decision posted
Comment period
November 2, 2023 - December 17, 2023 (45 days) Closed
Last updated

This consultation was open from:
November 2, 2023
to December 17, 2023

Decision summary

The Structural Manual has been updated with a few changes to incorporate comments received through the consultation process. The final version of the document will be posted on MTO’s technical Publication website.

Decision details

Structural Manual was posted on MTO’s technical Consultation Portal to obtain industry feedback. MTO has carefully reviewed all the valuable comments and has addressed them by making necessary updates to the document. The draft is being posted with highlights of important updates to go along with the responses provided in the comment response form. After some editorial tweaks, the final version will be published on MTO’s Technical Publication website in the upcoming weeks.

Comments received

Effects of consultation

As a result of the consultation, the industry’s feedback has been incorporated into the draft. In some sections, the text has been reworded for clarity. Some figures are modified/corrected to maintain consistency with the contents. A few corrections and updates have also been included

Connect with us

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

TCP number
000-0184
Type notice
Standard
Posted by
Structures Office
Proposal posted

Comment period

November 2, 2023 - December 17, 2023 (45 days)

Proposal details

The Structural Manual Draft of revision 60 has been reorganized to group similar concepts together. Each Section has minor clarifications & corrections. There are few major updates to Division 2 have also been incorporated such as renaming of Section 3 as “Deep Foundations” and Renaming of Section 4 as “Shallow Foundations” Section 5 now includes Approach Slab & Slope paving section from Section 16. Description of Wingwall Design has been updated for revised wingwall Design Aid DA 5-1 to DA 5-6. ACR Steel details and use of 1” bolt for span >50m bridges have been added to Section 8. Inspector Guard details has been added to Section 10 & Noise Barrier description now moved to Section 10 from Section 16. Section 12 has been updated for 500W MPa steel grade. Description of dowels has been moved to Section 12 from Section 16. Entire Section 15 has been revised include up to date information on sawn timber, prefabricated mass timber and treatment with preservatives. From Section 16 some information as mentioned above have been moved to more appropriate Sections of the Manual. Also, most of the pedestrian bridge requirements are removed and referred to CSA S7. In Division 3 Wingwall Design Aid DA 5- 1 through 5-6 has been updated for 500W Garde steel. A new Design Aid DA 10-1 and DA 10-2 have been added to list Dead Loads of permanent and temporary barriers. Rebar bends in Design Aid DA 12-1 has been updated for Garde 500W steel. Division 4 has been removed & updates to Structural Standard Drawings are now contained in a separate document “SSD Revision Sheet All-Rev” & all SSD prints are compiled in “SSD Complete Manual”. Both documents are available on MTO’s Technical Publication website. 

Comment

Commenting is now closed.

This consultation was open from November 2, 2023
to December 17, 2023

Connect with us