AMENDMENT TO OPSS 1004, November 2012 – Aggregates - Miscellaneous

TCP number
000-0109
Notice type
Standard
Applies to
SP - Special Provisions
No. specification
110S16
Last published
Posted by
Engineering Materials Office
Notice stage
Decision
Decision posted
Comment period
October 21, 2022 - November 11, 2022 (21 days) Closed
Last updated

This consultation was open from:
October 21, 2022
to November 11, 2022

Decision summary

No comment was received. Hence, SSP110S16 is finalized and will be published.

Decision details

No comment was received. SSP110S16 is accepted and finalized. A decision is made to publish SSP110S16.

Comments received

Effects of consultation

Public and internal stakeholders were consulted. No comment was received.

Supporting materials

Connect with us

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

TCP number
000-0109
Type notice
Standard
Posted by
Engineering Materials Office
Proposal posted

Comment period

October 21, 2022 - November 11, 2022 (21 days)

Proposal details

This posting aims to seek feedback from industry stakeholders on the following key changes:

  1. QA tests to demonstrate compliance with the physical property requirements in Table 7 shall be waived if the gabion stone, rip-rap, and rock protection are from sources on DSM #3.05.25. This change will reduce the administration of sampling and testing of quality aggregates from the sources on DSM.
  2. At the discretion of the Owner, prior material data demonstrating compliance with the physical requirements in Table 7 may be acceptable provided that such testing has been done within 12 months of the material being used in an MTO contract and field performance has continually been satisfactory. This change will reduce the administration of sampling and testing for a prior accepted material that demonstrated satisfactory performance for the last 12 months in an MTO contract.
  3. QA testing shall be done in the QA lab, except that mass gradation for gabion stone, rip-rap, and rock protection is to be done by CA at the Working Area. The CA may elect to carry out the referee testing directly after the QA testing. This change is to eliminate the concerns surrounding the handling and shipping of large rocks, resolve disputes more efficiently and reduce turnaround time.

Supporting materials

Comment

Commenting is now closed.

This consultation was open from October 21, 2022
to November 11, 2022