This consultation was open from:
April 4, 2022
to April 25, 2022
Decision summary
The document will be reposted as significant changes have been incorporated.
Decision details
As s result of the OPSS 422 consultation process, MTO has made a few significant changes to incorporate the comments received during consultation. The revised document will be reposted for public to review of the changes.
Effects of consultation
Changes are made to incorporate industry needs and maintain consistency with the document and with associated material and fabrication specification OPSS 1821.
Supporting materials
Connect with us
Original proposal
Proposal details
The updated specification will cover the requirements for the installation of precast reinforced concrete box culverts with span 3m or less only. The update of the specification includes changes to the depths of the granular bedding under the precast culvert and changes to the basis of payment.
Supporting materials
Comment
Commenting is now closed.
This consultation was open from April 4, 2022
to April 25, 2022
Comments received
Through the portal
1