OPSS PROV 422 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS WITH SPAN 3M OR LESS IN OPEN CUT

TCP number
000-0067
Notice type
Standard
Applies to
OPSS - Ontario Provincial Standard Specifications
No. specification
OPSS PROV 422
Posted by
Highway Design Office
Notice stage
Decision
Decision posted
Comment period
April 4, 2022 - April 25, 2022 (21 days) Closed
Last updated

This consultation was open from:
April 4, 2022
to April 25, 2022

Decision summary

The document will be reposted as significant changes have been incorporated.

Decision details

As s result of the OPSS 422 consultation process, MTO has made a few significant changes to incorporate the comments received during consultation. The revised document will be reposted for public to review of the changes.

Comments received

Effects of consultation

Changes are made to incorporate industry needs and maintain consistency with the document and with associated material and fabrication specification OPSS 1821.

Connect with us

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

TCP number
000-0067
Type notice
Standard
Posted by
Highway Design Office
Proposal posted

Comment period

April 4, 2022 - April 25, 2022 (21 days)

Proposal details

The updated specification will cover the requirements for the installation of precast reinforced concrete box culverts with span 3m or less only. The update of the specification includes changes to the depths of the granular bedding under the precast culvert and changes to the basis of payment.

Comment

Commenting is now closed.

This consultation was open from April 4, 2022
to April 25, 2022

Connect with us