AMENDMENT TO OPSS 180, NOVEMBER 2016

TCP number
000-0299
Notice type
Standard
Posted by
Contract Management Office
Notice stage
Exception
Exception posted
Last updated

This notice is about a decision that was not subject to the normal consultation process. Learn more about the types of notices on the Technical Consultation Portal.

Exception summary

The changes to NSSP ENVR0014 have been made as a result of amendments to the excess soil regulation, the soil rules,and based on feedback of the previous version.

Why consultation isn't required

This NSSP ENVR0014 has been updated to address concerns related to excess soil management during construction.

Exception details

a) Additional flexibility for management of asphalt impacted excess soil.
b) Clarity on submission of hauling records by the contractor to MTO.
c) Notes to designer- To include any additional excess soil management reports that are different from the standard designer options i.e. excess soil reuse planning reports.
d) This includes supplemental updates to PH-CC-183 and PH-CC-185.

Connect with us

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice