CAIS for OPSS 308, July 2023

TCP number
000-0236
Notice type
Standard
No. specification
CAIS 308
Posted by
Contract Management Office
Notice stage
Review
Proposal posted
Comment period
December 12, 2024 - January 16, 2025 (35 days) Closed
Last updated

This consultation was open from:

December 12, 2024
to January 16, 2025

Proposal summary

CAIS is updated for OPSS 308, July 2023. It updates various administrative and inspection activities related to the submission, equipment, material, application rates, field verification of application rate, interlayer shear strength testing and lot/sublot size.

Proposal details

This CAIS updates activities related to field verification of tack coat application rate by using a newly developed LS-325 procedure and appropriate reporting forms (PH-CC-325 and/or PH-CC-326), as applicable to analyzing the interlayer shear strength testing results; and activities related to submission requirements are clarified and submission of tack coat distributor calibration is required; and activities related to lot and sublot sizes and interlayer shear strength size testing.

Comment

Commenting is now closed.

The comment period was from December 12, 2024
to January 16, 2025

Connect with us

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice