Approach Slab Structural Standard Drawings

TCP number
000-0196
Notice type
Standard
Applies to
Structural Standard Drawing
No. specification
SS105-15,16&17
Posted by
Structures Office
Notice stage
Decision
Decision posted
Comment period
April 10, 2024 - May 10, 2024 (30 days) Closed
Last updated

This consultation was open from:
April 10, 2024
to May 10, 2024

Decision summary

The approach Slab Structural Standard Drawings will be published on MTO’s Technical Publication website after minor updates.

Decision details

The approach Slab Structural Standard Drawings were posted on MTO’s technical Consultation Portal to seek industry feedback. Only one comment was received which did not require any major update. After some editorial tweaks, the final version will be published on MTO’s Technical Publication website in the
upcoming weeks.

Comments received

Effects of consultation

No major changes or updates are required after the consultation.

Connect with us

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

TCP number
000-0196
Type notice
Standard
Posted by
Structures Office
Proposal posted

Comment period

April 10, 2024 - May 10, 2024 (30 days)

Proposal details

The Structural Standard Drawings (SSDs) have been updated to meet the design by CSA- S6-19, the latest CAD standards, and to incorporate 500W Grade of reinforcing steel. The SSD number of existing drawings has been changed from SS116-01, and SS116-02 to SS105-15 & SS105-17. A new SSD, SS105-16 has been developed for Approach Slab details with Sleeper Slab. The new numbers of these drawings are based on Section 5 of Division II of MTO’s Structural Manual. The SSD titles of existing drawings have been tweaked as well.

Comment

Commenting is now closed.

This consultation was open from April 10, 2024
to May 10, 2024