This consultation was open from:
September 18, 2023
to October 9, 2023
Decision summary
No comments were received during the consultation period.
Decision details
No comments were received. Posting is recommended to be closed and draft drawings implemented as standards.
Effects of consultation
The public was provided an opportunity to review and comment on the draft standard drawings. No comments were received.
Supporting materials
Connect with us
Original proposal
Proposal details
Three new MTO Drawings: MTOD 911.206: Guide Rail System, Concrete Barrier Type X Connection – 9.1 m Length, PVC Sleeves, Installation – Temporary MTOD 911.207: Guide Rail System, Concrete Barrier Type X Connection – 9.1 m Length, PVC Sleeves, Components MTOD 911.208: Guide Rail System, Concrete Barrier Type X Connection – 9.1 m Length, PVC Sleeves, Reinforcement Components.
Supporting materials
Comment
Commenting is now closed.
This consultation was open from September 18, 2023
to October 9, 2023
Comments received
Through the portal
0