This consultation was open from:
August 28, 2023
to September 18, 2023
Decision summary
No comments were received for this TCP consultation.
Decision details
MTO will proceed with the publication of NSSP BITU0033 Additional Sampling and Testing Requirements for Mix Performance Testing (MPT)
Effects of consultation
Consultation process provided opportunity for valuable feedback from the stakeholders. No comments were received.
Supporting materials
Connect with us
Original proposal
Proposal details
This provincial non-standard special provision will replace the mix performance sampling and testing requirements that are currently included in various individual NSSPs for Regression (BITU0026), Recovered Asphalt Cement (BITU0028) and Warm Mix Asphalt (BITU0029). This NSSP for MPT will act as standalone special provision to be included in trial contracts where MPT sampling and testing is needed for information purposes. The resulting changes to three NSSPs BITU0026, BITU0028 and BITU0029 are also attached as an Appendix for information purposes only. |
Supporting materials
Comment
Commenting is now closed.
This consultation was open from August 28, 2023
to September 18, 2023
Comments received
Through the portal
0