This consultation was open from:
July 14, 2023
to August 4, 2023
Decision summary
MTO did not receive any comments on this drawing. The drawing will be published on MTO’s technical publication website.
Decision details
The existing drawing SS116-10 is assigned a new number i.e., SS105-23. The new drawing number relate the SSD to the location of related contents in upcoming version of Structural Manual. The details of existing drawings have been updated to reflect field practices and it was posted on TCP. There were no comments received and drawing is considered to be published on MTO’s Technical Publication website.
Effects of consultation
Drawing will be published and implemented in CPS
Supporting materials
Connect with us
Original proposal
Proposal details
The existing drawing SS116-10 is assigned a new number i.e., SS105-23. The new drawing number relate the SSD to the location of related contents in upcoming version of Structural Manual. The details of existing drawings have been updated to reflect field practices.
Supporting materials
Comment
Commenting is now closed.
This consultation was open from July 14, 2023
to August 4, 2023
Comments received
Through the portal
0