350.05.03 Concrete The max… Comment on Construction Specification for Concrete Pavement and Concrete Base Comment ID 312 Commenting on behalf of Comment status Comment approved More about comment statuses 350.05.03 Concrete The max. 30% slag requirement is a hindrance in achieving the RCP requirements outlined in 350.08.03.04.03 Rapid Chloride Permeability. Read more Related actions Read the entire commentRead the notice
366.05.04 Concrete b) The… Comment on Construction Specification for Concrete Pavement and Concrete Base Comment ID 313 Commenting on behalf of Comment status Comment approved More about comment statuses 366.05.04 Concrete b) The minimum 28-Day concrete compressive strength shall be 30 MPa. This is not consistent with OPSS.PROV 350 requirements of 35 MPa. Both should include Class C-2 exposure as well. Read more Related actions Read the entire commentRead the notice
View the comments this notice received through the registry. You can either download them all or search and sort below.
Some comments will not be posted online. Learn more about the comment status and our comment and privacy policies.
Download comments
350.05.03 Concrete The max…
Comment on
Construction Specification for Concrete Pavement and Concrete Base
Comment ID
312
Commenting on behalf of
Comment status
350.05.03 Concrete
The max. 30% slag requirement is a hindrance in achieving the RCP requirements outlined in 350.08.03.04.03 Rapid Chloride Permeability.
Read moreRelated actions
366.05.04 Concrete b) The…
Comment on
Construction Specification for Concrete Pavement and Concrete Base
Comment ID
313
Commenting on behalf of
Comment status
366.05.04 Concrete
b) The minimum 28-Day concrete compressive strength shall be 30 MPa.
This is not consistent with OPSS.PROV 350 requirements of 35 MPa. Both should include Class C-2 exposure as well.
Related actions