MTO Guide for Water Crossing Hydrotechnical Reports

TCP number
000-0127
Notice type
Standard
Last published
Posted by
Highway Design Office
Notice stage
Review
Proposal posted
Comment period
December 22, 2022 - February 5, 2023 (45 days) Closed
Last updated

This consultation was open from:

December 22, 2022
to February 5, 2023

Proposal summary

Guide for the preparation of hydrotechnical reportsthat are to be submitted to MTO.  The guide is an update to the 2009 MTO Guide for Preparing Hydrology Reports for Water Crossings

Proposal details

This posting aims to seek comments and inputs from industry stakeholders on the updated guide for preparing hydrotechnical reports.

The guide provides direction on the documentation of the hydrologic and hydraulic analysis conducted as part of the preliminary design, detail design or special purpose study of existing and proposed highway water crossing infrastructure.

Comment

Commenting is now closed.

The comment period was from December 22, 2022
to February 5, 2023

Connect with us

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice