This consultation was open from:
December 22, 2022
to February 5, 2023
Proposal summary
Guide for the preparation of hydrotechnical reportsthat are to be submitted to MTO. The guide is an update to the 2009 MTO Guide for Preparing Hydrology Reports for Water Crossings
Proposal details
This posting aims to seek comments and inputs from industry stakeholders on the updated guide for preparing hydrotechnical reports.
The guide provides direction on the documentation of the hydrologic and hydraulic analysis conducted as part of the preliminary design, detail design or special purpose study of existing and proposed highway water crossing infrastructure.
Comment
Commenting is now closed.
The comment period was from December 22, 2022
to February 5, 2023