A review of the accuracy specifications from the perspective of an Ontario Land Surveyor are attached. The existing specifications are vague and leave out too many details to ensure that the requirements can be met. Suggestions are made based on experience with a similar project in the past.
Read more
The NSSP is a step in the right direction because it will reduce emissions due to construction ion by reducing milling time and hauling away cuttings from the milling.
It will also lead to better rehabilitated highways.
Read more
View the comments this notice received through the registry. You can either download them all or search and sort below.
Some comments will not be posted online. Learn more about the comment status and our comment and privacy policies.
Download comments
First of all, I would like…
Comment on
Amendment to OPSS 510 - Contractor Partial Depth Asphalt Removal Design and Automatic Machine Guidance
Comment ID
76
Commenting on behalf of
Comment status
Related actions
A review of the accuracy…
Comment on
Amendment to OPSS 510 - Contractor Partial Depth Asphalt Removal Design and Automatic Machine Guidance
Comment ID
80
Commenting on behalf of
Comment status
Related actions
The NSSP is a step in the…
Comment on
Amendment to OPSS 510 - Contractor Partial Depth Asphalt Removal Design and Automatic Machine Guidance
Comment ID
83
Commenting on behalf of
Comment status
Related actions
Comments provided for TCP…
Comment on
Amendment to OPSS 510 - Contractor Partial Depth Asphalt Removal Design and Automatic Machine Guidance
Comment ID
178
Commenting on behalf of
Comment status
Related actions