The 2+1 highway is what is needed to solve the volume and traffic problems in areas that do not require 4 lane highways such as HWY 11 and HWY 7 in Eastern Ontario between Peterborough and Carleton Place Ontario.
My only concern is that two 14-16 KM stretches nowhere near enough of a test pilot. Make it at least two 50 to 100KM stretches.