Commentaire
The 2+1 highway is what is needed to solve the volume and traffic problems in areas that do not require 4 lane highways such as HWY 11 and HWY 7 in Eastern Ontario between Peterborough and Carleton Place Ontario.
My only concern is that two 14-16 KM stretches nowhere near enough of a test pilot. Make it at least two 50 to 100KM stretches.
Submitted 11 January 2022 2:31 PM
Comment on
Rapport sur les paramètres de conception et de sélection de l’emplacement du projet pilote de route à 2+1 voies
PCT Numéro
000-0045
Comment ID
179
Commenting on behalf of
Comment status