Comment
Great idea in theory but the two proposed stretches of highway already include regular passing lanes and straight stretches where it is currently possible to overtake. The pilot project should include sections of the highway where it is not currently possible to overtake due to numerous hills and corners since those are the sections where people take unnecessary risks trying to overtake and accidents occur. Straightening the winding sections further north of the proposed areas such as those between Marten River and Latchford would be effective in reducing collisions and the 2+1 barrier would prevent head-on collisions in those winding stretches resulting in lives saved.
Submitted December 23, 2021 7:10 PM
Comment on
2+1 Roadway Pilot Project, Site Selection and Design Parameters Report
TCP number
000-0045
Comment ID
164
Commenting on behalf of
Comment status