Consulter les commentaires qu'a reçus cet avis par l'entremise du registre. Vous pouvez soit tous les télécharger, soit utiliser la fonction de recherche et de tri ci-dessous.
The draft policy indicates that the buried approach slab would typically be installed on a gradient of 5% to 10%, but there is little to no discussion on how to choose the gradient AND there is no discussion on any complications that may arise based on the GRADE of the highway approaches.
Read more
I am concerned that, since the depth of the granular backfill placed against the tapered concrete fillet will be reduced from full-depth to a theoretical zero depth, the last few inches of the granular wedge may not be properly compacted and will be the cause of pavement cracking in this location.
Read more
On the proposed SS105-18 drawing, the Longitudinal Section indicates a minimum 250 mm of sub-base pavement layers (granular) at the end of the approach slab.
Read more
Consulter les commentaires qu'a reçus cet avis par l'entremise du registre. Vous pouvez soit tous les télécharger, soit utiliser la fonction de recherche et de tri ci-dessous.
Certains commentaires ne seront pas affichés en ligne. Apprenez-en davantage sur l'état du commentaire et sur nos politiques relatives aux commentaires et à la protection de la vie privée.
Télécharger les commentaires
The draft policy indicates…
Comment on
Dallages d'approche souterrains pour ponts à poutres intégrales et semi-intégrales
Comment ID
474
Commenting on behalf of
Comment status
Related actions
I am concerned that, since…
Comment on
Dallages d'approche souterrains pour ponts à poutres intégrales et semi-intégrales
Comment ID
475
Commenting on behalf of
Comment status
Related actions
On the proposed SS105-18…
Comment on
Dallages d'approche souterrains pour ponts à poutres intégrales et semi-intégrales
Comment ID
476
Commenting on behalf of
Comment status
Related actions