Commentaire
910.04.01.01 “induced slip requirement”
-what does “induced slip requirement” refer to? Does it mean “wedge draw-in”? if so, it is system-dependant and covered on each system ETA or equivalent
Submitted 15 mars 2023 1:21 PM
910.04.01.01 “induced slip requirement”
-what does “induced slip requirement” refer to? Does it mean “wedge draw-in”? if so, it is system-dependant and covered on each system ETA or equivalent
Submitted 15 mars 2023 1:21 PM